Fire Station Renovation & Modular Addition

The Town of Chelmsford hired Triumph Modular to assist with a much-needed renovation and modular fire station addition for the North Station, originally built in 1956. This project followed four previous modular classroom installations Triumph completed for the town, reinforcing the value and speed of modular construction.

Challenges with the Original Facility

The existing fire station layout featured undersized sleeping quarters located behind the apparatus bay, requiring firefighters to walk through the garage to access shared living areas. The outdated facility lacked privacy, ADA compliance, and the flexibility needed for today’s modern co-ed fire departments.

Scope of the Modular Solution

The solution involved demolishing the original sleeping quarters and adjacent common areas, replacing them with a new two-story modular fire station building. The expansion added private bedrooms and opened space for a redesigned apparatus bay with two full garage doors for straight-through access.

(Looking for a custom modular building solution? Check out our permanent modular building options here, and our modular commercial housing options here.)

Fast-Track Construction with Modular

To minimize disruption, Triumph Modular temporarily relocated firefighters and completed over 80% of the structure off-site in partnership with MODLOGIQ. This fast-track approach cut the timeline nearly in half compared to conventional construction methods and helped meet the town’s urgent need for functional space.

Firefighter Health & Safety Features

A new gear locker room—accessible only from the apparatus bay—helps isolate contaminants from living areas. The room is independently ventilated and includes a washer-extractor system for cleaning turnout gear.

Modern, Efficient Living Quarters

The 4,320-square-foot modular addition was built using six-over-six modules and includes:

Cost and Time Savings

Compared to a full teardown and rebuild, this modular fire station addition saved the Town of Chelmsford millions of dollars and nearly a year in construction time. The building now meets modern fire safety and accessibility standards while preserving the historical value of the North Station.

Learn more about our work with municipal modular buildings or explore more fire station modular projects.

▶ Watch the Video Overview