“Time is Precious.”  “Each project completed faster than traditional construction methods without sacrifice to quality.”

Modular Building Past Project Video Library

View a collection of modular building installation videos from Triumph Modular. This collection of videos of modular and prefab construction are a glimpse of what our team is capable of, and displays how thorough we operate. Below you can find time-lapse construction videos, interviews, and testimonials.

 

Modular Construction of David H. Koch Childcare Center in Cambridge

  • 2 minutes
  • 16,000 square feet
  • Permanent
  • Conception to occupancy 8 months
  • View case study

 

Temporary Modular Construction ESPN at US Open 2015

  • 1 minute 30 sec
  • 10,670 & 6,144 square feet
  • Temporary
  • Conception to occupancy 6 months

 

 

North Andover Early Childhood Center – Permanent Modular School

  • 7 minutes
  • 13,000 square feet
  • Permanent
  • Conception to occupancy 5 months
  • View case study

 

30 High Performing, Energy Efficient, Modular Classrooms Needham Newman School Installed in 60 Days

  • 1 minute
  • 35,620 square feet
  • Temporary
  • Conception to occupancy 6 months
  • View case study

 

Triumph Modular: Green Modular Construction, Carroll School

  • 4 minutes
  • 1,262 square feet
  • Temporary
  • Conception to occupancy 6 months
  • View case study

 

Carroll School Award Winning Modular Classroom

  • 6 minutes
  • 1,262 square feet
  • Temporary
  • Conception to occupancy 6 months
  • View case study

 

Harvard Yard Child Care Center Sustainable Modular

  • 2 minutes 30 sec
  • 5,700 square feet
  • Temporary
  • Conception to occupancy 6 months
  • View case study

 

Bath Iron Works Modular Two – Story Office & Workshop Building

  • 4 minutes
  • 4,032 square feet
  • Permanent
  • Conception to occupancy 4 months

Want to Learn More?

If you are interested in learning more, get in touch.