The BLOCS™ Modular Building System showcases a cutting-edge solution for expanding flexible office space at the Ergon Oil Refinery in Newell, West Virginia. This five-piece modular structure offers 3,600 square feet of customized space on a 5-year lease.​


Key features of the project include:​

– New-from-factory construction with high-quality finishes​

– LED lighting for energy efficiency and improved visibility​

– Luma beige gypsum walls for a bright, professional appearance​

– Enhanced insulation built to the newest code requirements for better climate control and noise reduction​

– BLOCS™ Modular Walls for easy reconfiguration of interior spaces​

– T-grid acoustical ceiling for improved sound management and efficient data installation​

– Our Solutions: Canopy Stair System, Business Office, and Conference Room Furniture ​

– Fully equipped kitchenette​

Due to concurrent site preparation, the installation was impressively quick, finishing in just two weeks. The modular building offered a modern, comfortable workspace that improved conditions for the displaced office staff. Triumph Modular’s approach with Ergon was highly consultative, focusing on tailoring the solution to the client’s needs rather than offering a one-size-fits-all option. The customer required a flexible layout that our BLOCS™ clear span design supported. This customer-centric approach, combined with a single point of contact throughout the sales and installation process, resulted in high customer satisfaction. ​

This project demonstrates the adaptability and efficiency of modular construction in addressing complex space requirements, particularly in industrial settings where rapid deployment and minimal disruption are crucial. ​